Tuesday, June 30, 2015

Work behind the scenes


30.6.2015
grass cutting




14.7.2014

Buying in ready seasoned wood for campfires


and sawdust for compost toilets

30.6.2014
Repairing steps



26.6.2014
Hand rail by steps to West meadow pitches


3.6.2014
Collecting sawdust from the sawmill for the compost toilets




30.5.2014
Preparing lid for sawdust container


Making a base for the barrel




Recycled barrel for sawdust refil, in position outside one of the compost toilet


3.5.2014

"Mudguard"  takes on a new meaning


Lane clearing, dead leaves and wind damage 9.12.2013.
Hundreds of trugs and trailer loads each year.


Shack roof, annual protection 2.9.2013





Chris the rotivator



Chris the Roofer









No comments:

Post a Comment